FracMan Projects: Mining Industries
Groundwater Modeling for Tailings Ponds
Client: Chino Mines Company
Contract Amount: $100,000 (approximate)
Performed three dimensional groundwater flow and solute transport numerical
modeling to predict long-term effects of tailings pond expansion on sulfate
concentrations in groundwater. Model calibration was based on existing field
data and data obtained from aquifer tests on existing wells.
Probabilistic Groundwater/Methane Mine Inflow Study
Client: Westinghouse Hanford Company
Contract Amount: $100,000
Developed a stochastic hydrogeologic model to estimate groundwater and methane
inflow rates into an underground facility in low permeability fractured basalt
as part of the design of an underground testing facility. Uncertainties in
all critical elements of the data base were incorporated into the analysis,
including the geologic structure and hydrologic parameters. The resulting
probabilistic inflow estimates were subsequently used to design the dewatering
and ventilation systems for the facility to address an acceptable level of
risk. The study, which cost about $100,000, resulted in a system design which
cost tens of millions of dollars less than would have been justified by typical
conservative deterministic design methods.
|